Reflective Cracking on Airport Pavements

Tensar's guide to rehabilitating runways, taxiways and aprons, built around the argument that a thicker overlay buys about a year of crack delay per inch and an interlayer buys more for less closure time.

What it covers

  • Why reflective cracking signals the start of rapid deterioration
  • The cost of the traditional thicker-overlay remedy
  • GlasGrid pavement reinforcement on airfield pavements
  • Where each Tensar system fits in an airfield section
  • Reducing future maintenance rather than only the immediate repair

Notes from us

The number that makes this document worth reading: an inch of overlay buys roughly a year before the reflective cracks come through it again. That is the accepted rule of thumb, and once it is stated plainly the economics of the thicker-overlay habit stop looking obvious.

Airfields are the case where that matters most, because the cost is not the asphalt. It is the closure. A taxiway out of service is a real operational bill, and paying it again in four years rather than twelve is the expensive part of the decision.

The other point worth taking from it: reflective cracking is not a surface complaint. Once cracks are through, water follows them into the layers below, and what began as a resurfacing job becomes a reconstruction. Waiting is the choice that costs money.

This is a planning document rather than an installation one. When you get to placing the material, the installation guides are the ones you want: GlasGrid, GlasGrid TF and GlasPave. If you are still choosing between them, start with the selection guide.

Road Fabrics supplies and installs the Tensar interlayer range. Tell us about the project.

Ready to strengthen your next project?

Tell us about your site and performance goals. Our team will match the right materials and installation approach, and get you a quote fast.